Annunciator RTK Testing
Testing Procedures
Measure annunciator channels time delay.
Download:
Annunciatior RTK P725 Test Format.
Equipment Required
External Timer: TM200
MCB 2-pole.
Connection Cables (Banana Type).
TM200
MCB 2-Pole
Connection Cables
Timing Test
Connection will be same as the shown figure.
RTK unit has internal cards. Every card controls two channels.
Every card has some deep switches, one is for channel time delay and the other one is for card address.
To get 5 seconds time delay make all deep switches off.
To adjust card addresses, refer to
User Manual
.
RTK annunciator has front control card.
Open the front card with any small screw driver and make configuration deep switch on configuration mode.
Use front card buttons to program the annunciator.
RTK annunciator has 24 different functions. In the back side of annunciator unit there is a fixed label that contains the 24 channels functions.
Activate/De-activate functions for each channel separately.
Use the MCB to start the timer and the channel alarm initiation also.
Channel output will stop the timer.
Repeat this test for all of annunciator channels.
Connection Circuit
Home
Site Map
About Substations
Formats
Auxiliary Relays
Equipments Formats
Protection Formats
>
Energization Tests
Functional Test Format
Manuals
Software
Support
Testing & Commissioning
Test Procedures
Relays Calculations
Relays Configuration
Tutorials
References
Label Design
Blog
About Me