Auxiliary Relays Testing
Testing Procedures
Measure Relay Pick up & Drop off Voltage/current.
Measure Relay Pick up & Drop off Timing.
Measure Relay Burden.
Measure Relay Contact Resistance.
Download:
Auxiliary Test Result Format
Equipment Required
Injection Kit (Sverker, Freja, .. etc).
Measurement Device (Multi-meter).
Connection Cables (Banana Type).
Sverker 760
Multi-meter
Connection Cables
Pick Up & Drop Off Test
Connection will be same as the shown figure.
Increase voltage until the relay picks up. Note down the pick up value for voltage & current.
Decrease voltage until the relay drops off. Note down the drop off value for voltage & current.
Connection Circuit
Pick Up & Drop Off Timing Test
For timing test we will use one pole of MCB series with Ammeter to cut dc supply off.
Use the other pole of MCB for starting sverker timer.
Use any contact from the aux. relay to stop sverker timer.
Inject 125V directly to the relay coil. Note down the pick up time.
Energize the relay with 125V then switch the supply off. Note down the drop off time.
MCB 2-Pole
Burden Test
Energize the relay with 125V and measure the dc current.
Calculate the relay power (W) = 125v x measured current
Home
Site Map
About Substations
Formats
Auxiliary Relays
Equipments Formats
Protection Formats
>
Energization Tests
Functional Test Format
Manuals
Software
Support
Testing & Commissioning
Test Procedures
Relays Calculations
Relays Configuration
Tutorials
References
Label Design
Blog
About Me